In the interest of our customers we endeavour to perform the required maintenance work of our storage facilities in such a way that we are able to provide provision of the requested storage services at any time.

In 2025 the following maintenance is planned:

Austria

PeriodAvailable rate – Injection
21.10.2025 06:00 – 21.10.2025 15:001 434 MWh/h (16,1 %)
22.10.2025 06:00 – 22.10.2025 15:007.456 MWh/h (83,9 %)
PeriodAvailable rate – Withdrawal
21.10.2025 06:00 – 21.10.2025 15:001 835 MWh/h (14,3 %)
22.10.2025 06:00 – 22.10.2025 15:0011 011 MWh/h (85,7 %)


Urgent Market Messages can be found here.

Limitations and Interruptions of the storage services will be handled according to article 5 in our General Terms and Conditions.

Germany

PeriodAvailable rate – InjectionAvailable rate – WithdrawalReason
15.09.2025 – 02.10.2025 (6:00 a.m. – 6:00 p.m.)0 MWh/h (GTS+NETRA)0 MWh/h (GTS + NETRA)Maintenance of the Station and of BEP